Click on any of the images below to view in more detail.
Non-slip deck grating is now fitted behind the wheelhouse
The main engine exhaust system showing two inlets to the silencer;one from each side of the engine
Working on the engine room pipework
The framing on the fish room ceiling has been completed
Another part of the framing on the fish room ceiling
The galley floor units have been completed
Making connections to the gearbox
The hydraulic pipework to the net drums has been fitted
Painting inside the shelter deck
The shower room under construction
More electrical fitting being done in the wheelhouse
The front of the wheelhouse where displays are to be mounted
Panelling work continues in the wheelhouse