Click on any of the images below to view in more detail.
The first cabling is now being installed in the engine room
The sea cocks have been fitted through the engine room hull plates
Pipework is being installed to the tanks in the engine room
Still some welding to do in the fo'c's'le
The insulation has been fitted in the deck house
The fridge and freezer have been fitted into the galley area
Hydraulic pipework is being installed on the aft main deck
Hydraulic connections have been made to the net drums on the aft main deck
The floor joists have been fitted in the wheelhouse
Fitting the floor panels in the wheelhouse