Concrete ballast has been placed in the bilges of the engine room
The engine room has now been painted out
Another view of the engine room's paint job
Building of framework continues in the deck house
Decorative panels waiting to be fitted in the deck house
Paneling of the mess area is progressing well
The mess ceiling is also being paneled
The fridge and freezer have been delivered for fitting into the galley
Insulation has been fitted in the wheelhouse ceiling
The framework is being built in the wheelhouse
Above the wheelhouse tailpipes have been fitted to the exhausts
Pipework is being installed for hydraulics systems on the upper aft deck