Week 25
Click on any of the images below to view in more detail.
The Gilsen frame has been fitted on deck
The sorting table has been installed in the shelter deck
Work continues inside the wheelhouse
The seating is being built in the mess area
Parts for a net pond waiting to be assembled
Installing a stairway between engine room and deck house
We now have a name on the bow
The registration number is also now on the bow