The Dry Dock was built by ourselves in 1997 and then underwent a complete refurbishment at Sunderland in December 2008.
Skills on offer include:
Removing the engine into the fishroom for lifting out
Lifting the old engine out
The engine safely ashore
The engine room after the removal
Removing the old nozzle
The main deck with access hole re-closed
<<BACK